CLIENT: Electricity industry of Serbia
PROJECT TYPE: Risk assessment
The study looked at the safety and technical aspects of the state of the elements, in accordance with the defined program tasks. After determining the route of the recording, orthophotos were obtained, obtained by aerial recording, entered into the GIS database and overlapped with the existing substrate, and after that, risk identification, analysis and evaluation were performed.